ON JUNE 12, CONCRETE POURED ON C.I.S THIRD SPAN OF PP134-PP135. THIS IS LOCATED IN BETWEEN OF THE 2 COMPLETED SPAN AT C.I.S I SITE. FORTUNATELY, NO BAD INCIDENT HAPPENED AS THE PROGRESS COMPLETED WITHIN A FEW HOURS. SO FAR, AT C.I.S II SITE, 3 SPAN ARE UNDER CONSTRUCTION, ONE OF THEM IS NOW INSTALLING THE OUTER SHUTTERS AND THE REST ARE INSTALLING THE CRIBS. AS A CONCLUSION, 5 SPANS ARE UNDER CONSTRUCTION. AFTER THE FIRST LAYER CASTING, IT IS BELIEVED TO PROCEED WITH SECOND LAYER CASTING WITHIN 20 DAYS. HOPEFULLY, THE COMING MONSOON SEASON WILL NOT AFFECTS MUCH THE PROGRESS BUT ENCOURAGES EVERYBODY TO DOUBLE UP EFFORDS TOWARDS THE END. AS THE FIRST LAYER CASTED, IT CONTRIBUTES SOME PERCENTAGE TO THE CAST IN-SITU PROGRESS AND MAKES OVERALL COMPLETION PERCENT UP TO 21.98%.