Monday, December 15, 2008

CIS GOT 1 MORE

Photo 1 : PP146A-PP147A, ready to be lowered.

Photo 2 : PP143-PP144 before casting.

Photo 3 : PP143-PP144 after casting, is on curing period.


Photo 4 : PP137A-P138A is ready to receive its weight.

ONE MORE SPAN AT CAST IN-SITU SITE, CUMMULATIVELY 11 SPANS CASTED. THE SECOND LAYER CONCRETE POURED YESTERDAY DEC13 ON SPAN PP143A-PP144A. MEANWHILE, THE LAST SPAN OF CIS I IS PLANNED FOR ITS 1st CASTING AROUND THIS WEEK BECAUSE MOST OF THE REINFORCEMENT IS READY AND SOME OF THE INNER SHUTTERS WERE START PLACED. SO, WITH 3 BALANCES MORE, AND THE PERCENTAGE OF CIS PROGRESS IS INDICATED AS 74.67 %.

PARAPETS MOVE ON 3 PATH

PARAPET GANTRY NO.1 IS NOW REACHING THE SPAN OF P131-P132. MEANWHILE PARAPET GANTRY NO.2 IS BUSY ERECTING THE PARAPETS ON PP3-PP4. ON THE OTHER SIDE, PARAPET GANTRY NO.3 WILL BE WORKING ON THE COMPLETED SPAN CHASING LAUNCHER GIRDER NO.2 WHICH IS ON P42-P43.

CASTING UPDATE

Photo 1 : Among the balances at yard.


THE LATEST UPDATE SAYING THAT TOWARDS THE LAST EXISTED PIER ON NANGLOI RAILWAY STATION TO NANGLOI STATION OF P35, THERE ARE 10 SEGMENTS BALANCE TO CAST. CASTING OF PARAPET IS NOW BEING CONCERNED ON CURVE SPAN AND NON-STANDARD PARAPET.

Monday, December 1, 2008

INDIA ELECTION

LG NO.2 CONTINUES ITS SCHEDULE TO WORK ON NEXT SPAN AFTER BEING STOPPED DUE TO INDIA'S ELECTION ON 29th NOVEMBER IN ORDER TO AVOID ANY INCONVINIENCE CIRCUMSTANCES. AFTER AN ATTACK IN MUMBAI, SECURITY HAS BEEN EMPHASIZED FROM PUBLICS TO FACILITIES AND BUILDINGS TO CONSTRUCTION AREA. SO FAR, THERE WAS NO INCIDENT, BUT LG NO.2 IS CONCERNING ON THE COMING SPANS EVEN THE LAST 6 PIERS TOWARDS NANGLOI STATION IS STILL NOT BAING CONSTRUCTED.

LG NO.1 CLOSES ITS DIARY

Photo 1 : Front support has been de-erected.


BY STRESSING DONE AT FRIDAY NIGHT OF 28th NOVEMBER, LAUNCHING GIRDER NO.1 IS NOW BEGIN TO BE DISMANTLED. FROM RAJDHANI PARK TO MUNDKA, LG NO.1 HAD DONE 39 SPANS.

Monday, November 10, 2008

YAMUNA CROSSING BRIDGE

Photo 1 : Pier cap on river bank

Photo : The pier

Photo 3 : View of a span

Photo 4 : Bridge and the river

Photo 5 : View on span

Photo 6 : View on parapet

Photo 7 : View towards the depo

Photo 8 : View of the river from the bridge

Photo 9 : Underneath the segments

Photo 10 : Another view

Photo 11 : Long straight spans, usually the delta will be submerged by water during monsoon

Photo 12 : Another view

Photo 13 : A part of the bridges headings to cross the river

Photo 14 : Another view

Thursday, October 23, 2008

E.D's SITE VISIT

Photo 1 : From left Mr.Anuar Abdul, Mr.Shukor and Mr.Zulkifli Kamaruddin.

HE ARRIVE IN DELHI FOR 2 DAYS, SPENDING TIME WITH ALL STAFFS TO SEE THE CURRENT PROGRESS. EXECUTIVE DIRECTOR OF MTD, MR. SHUKOR TOOK A CHANCE TO VISIT THE SITE. A LOCAL STAFF SAID, HE FELT SO SURPRISE TO SEE HOW MR. SHUKOR DIDN'T MIND TO WALK FROM CIS SITE, PASSING THE MUNDKA DIVERTED CURVE ROAD TO REACH LAUNCHING GIRDER NO.1, ACCOMPANIED BY MR. ZULKIFLI AND MR. ANUAR. HOPE THIS VISIT WILL INSPIRES EVERYBODY TO LET THE IMPLEMENTATION OF THE PROJECT GOES WELL.

Wednesday, October 22, 2008

FLAME BLAZES THE RAMP

Photo 1 : Front view of U5.


Photo 2 : Side view of U4.

Photo 3 : View of the ramp from erected span of P152A-P153A.

Photo 4 : Shutters of U3.

THE SUN DANCES DIZZILY AND LIGHTS THE DAYTIME. HENCE, THE FLAME IS BLAZING THE SKIN. THOSE EXTREME DAYS WASN'T STOP THE WORK OF RAMP. OVERALL COMPLETION IS ROUGHLY ESTIMATED, ABOUT 70 %. THE RAMP SITE IS THE FINAL TRACK LEADS THE METRO LINE TO THE DEPO. IT IS DIVIDED INTO 5 UNITS, FROM UNIT 1 (U1) TO UNIT 5 (U5). UNIT 4 AND UNIT 5 WERE COMPLETED. MEANWHILE, MOST OF THE SHUTTERS OF UNIT 3 HAD BEEN ERECTED, ONLY NOW EMPHASIZING ON REINFORCEMENT PROGRESS.

DOCTOR MET PATIENTS

Photo 1 : Dyanamic hardness test.

Photo 2 : Ultra-sonic test.

Photo 3 : Debris of an unfortunate event.

(More information of the debris: http://broadband.indiatimes.com/videoshow/3614526.cms)


I NOTICED A PHRASE, LEARNING FROM YESTERDAY, LIVING TODAY AND THINKING FOR TOMORROW. THE TRAGIC INCIDENT (launcher owned by a local company) AT SHAKARPUR, EAST DELHI ON SUNDAY MORNING WERE BECOMING THE FRONT PAGE OF NEWSPAPER AND SPREADING EVERYWHERE THROUGH LIVE BROADCASTING. THE VICTIM RECEIVED CONDOLENCES, BUT THE IMPACT REALISES EVERY WORKER AT LAUNCHING SITE TO BE READY AND PROTECTED AGAINST ANY CIRCUMSTANCES. WHATEVER WE DO, SAFETY FIRST! ON 21st OCTOBER, 3 PERSON REPRESENTING THE INSPECTION AND TESTING ENGINEER (ITE) CAME TO LAUNCHING SITE TO TEST, IN ORDER TO MAKE SURE LAUNCHING GIRDER IS OPERATED WELL. THERE WERE 2 TEST CONDUCTED, DYNAMIC HARDNESS TEST AND ULTRA-SONIC TEST. MAIN PURPOSE OF THOSE TEST IS TO CHECK THE STEEL COMPONENT EITHER IT IS FREE FROM DEFECT OR NOT SUCH AS CRACK, AGEING DEFECT, EVENTHOUGH IF IT CONTAINS AIR SPACES OR PARTICLES THAT MIGHT REDUCE ITS STRENGTH OR HARDNESS.

EID OPEN HOUSE AT EMBASSY

Photo 1 : Among the scene.

Photo 2 : Audition for searching the hidden talent.

ON 18th OCTOBER, WE WERE INVITED TO A HAPPENING AIDILFITRI CELEBRATION ORGANISED BY MALAYSIANS WHO ARE LIVING AROUND DELHI. THE VENUE WAS OUR MALAYSIAN HIGH COMMISSION'S MAIN BALLROOM OF CHANCERY BUILDING AT CHANAKYA PURI. ATTENDED BY MORE THAN 60 PEOPLE, THE GATHERING BROUGHT CHEERS AND UNFORGETTABLE MEMORIES. THE SERVED FOOD WAS RELISHING AND DELICIOUS THROUGH DELICATE PREPARATION, IT MADE EVERY PERSON MISSES THEIR HOMETOWN.