Saturday, May 10, 2008

2nd CIS SPAN CASTED


Photo 1 : Concrete poured into mould of span PP135A-PP136A

ON MAY 09, THE SECOND CAST IN-SITU SPAN SUCCESSFULLY CASTED. THIS PP135A-PP136A SPAN STARTED CONCRETING AT 1.30pm AND FINISHED THE LAST CONCRETE DROP AT 9.30pm. THE VOLUME OF CONCRETE USED FOR THIS SECOND LAYER AMOUNTED AS 106 CUBIC METRE. LUCKILY, THE PROGRESS GOES SMOOTHLY WITHOUT ANY INCONVINIENCE EVEN ACCIDENT.


Photo 2 : Cribs for span PP145A-PP146A

A DAY IN ADVANCE, CRIBS INSTALLATION OF SPAN PP145A-PP146A IS COMPLETED AND NEXT FOCUSING ON SETTINGS OF THE MOULD.