Wednesday, July 9, 2008

HAND RAILING AND OHE MASS

Photo 1 : Scenery of site captured near Rajdhani Park station where the hand railings start on.


Photo 2 : On the opposite view, the overhead electrical mass stands up one by one on OHE parapet.

IT IS NOT A COMPLETE DRINK WITHOUT ITS GARNISHING, SERVED BY A TALENTED CHEF. AS THE SEGMENTS ERECTED, LOWERED TOUCHING THE PIER CAPS THEN STRENGTHEN UP THE ERECTED STRANDS BY GROUTINGS AND TO MAKE THEM CONTINUOUSLY STRIP HOMOGENOUS, EACH END OF SPANS IS ADJUSTED THROUGH ITS HORIZONTAL AND VERTICAL BEARINGS. PARAPET CROWNED AND STICTHED BY CONCRETE, FOLLOWD BY INSTALLING THE HAND RAILINGS AND OVERHEAD ELECTRICAL MASSES.