Photo 1 : Launching Girder No.2 is getting away from Nangloi Railway Station.
Photo 2 : The coming last 3 span of LG No.1
Photo 3 : After erecting the span of P132-P133, LG No.1 was reaching the CIS I site, then will be onwarded by 3 times of unusual autolaunching before working on the last 3 spans.
I REALLY APPRECIATE ALL THE VIEWERS, THANK YOU FOR SPENDING YOUR TIME TO REVIEW AND HOPEFULLY THIS PAGE MAY GIVE YOU SOME INFORMATION.
IF POSSIBLE, YOU CAN LEAVE
ANY COMMENTS AND SUGGESTION. YOUR FEEDBACK IS WELCOME AS I
WILL LOOK FORWARD.
THANKS A LOT ONCE MORE.
THE BC 9 PROJECT IS ABOUT A CONSTRUCTION OF ELEVATED VIADUCT ON INDERLOK-MUNDKA. IT WAS STARTED SINCE JUNE 2006 AND WILL BE COMPLETED IN 30 MONTHS CONTRACT PERIOD. THE LENGTH OF THE VIADUCT IS ABOUT 4.784km FROM CH9.707 TO CH14.491. THIS SECOND PHASE OF MRTS CONTRACT CONSISTS STRUCTURAL WORKS OF 4 ELEVATED STATION FROM NANGLOI TO MUNDKA PASSING THROUGH NANGLOI RAILWAY STATION AND RAJDHANI PARK. A YARD AT MUNDKA PRODUCES PRECAST STRUCTURES THEN WILL BE ERECTED ON SITES. THERE ARE 156 SPANS WHICH 3 LAUNCHING GIRDERS USED FOR ERECTING SEGMENTAL BOX GIRDERS AND 3 GANTRIES FOR INSTALLING THE PARAPETS. 15 SPANS WILL BE CONSTRUCTED USING THE CAST-IN-SITU METHOD. THE REST ARE INSTALLING THE CABLE TROUGH AND HAND RAILING.