Photo 1 : Only 1 and a half span away, the parapet erection has to be stopped awhile as waiting the launcher to move on.
Photo 2 : Parapet for span P152-P153.
Photo 3 : Last piece for now, an S1 size parapet is being erected on LG No.2 track (from Nangloi Railways Station).
Photo 4 : A scene at CIS II.
THE EXIT LINE, FROM MUNDKA STATION TO THE DEPO IS NOW PLACING THE LAST FEW PARAPET TO GO BEFORE HANDING IT OVER TO THE LAING-INDU JV. DUE TO A LIMITED SPACE, CRANES WERE USED. SO FAR, ONLY 1 SPAN MORE BALANCE TO ERECT THE PARAPET.
Thursday, March 12, 2009