END OF APRIL, TOTAL 86 OUT OF 156 SPANS HAVE BEEN ERECTED AND 1 SPAN ON LG3 IS BEING ERECTED AND BELIEVED TO BE COMPLETED ON 30TH APRIL. 86 SPANS CONSISTS 863 NUMBERS OF SEGMENTAL BOX GIRDERS WITH BALANCE OF 675.
I REALLY APPRECIATE ALL THE VIEWERS, THANK YOU FOR SPENDING YOUR TIME TO REVIEW AND HOPEFULLY THIS PAGE MAY GIVE YOU SOME INFORMATION.
IF POSSIBLE, YOU CAN LEAVE
ANY COMMENTS AND SUGGESTION. YOUR FEEDBACK IS WELCOME AS I
WILL LOOK FORWARD.
THANKS A LOT ONCE MORE.
THE BC 9 PROJECT IS ABOUT A CONSTRUCTION OF ELEVATED VIADUCT ON INDERLOK-MUNDKA. IT WAS STARTED SINCE JUNE 2006 AND WILL BE COMPLETED IN 30 MONTHS CONTRACT PERIOD. THE LENGTH OF THE VIADUCT IS ABOUT 4.784km FROM CH9.707 TO CH14.491. THIS SECOND PHASE OF MRTS CONTRACT CONSISTS STRUCTURAL WORKS OF 4 ELEVATED STATION FROM NANGLOI TO MUNDKA PASSING THROUGH NANGLOI RAILWAY STATION AND RAJDHANI PARK. A YARD AT MUNDKA PRODUCES PRECAST STRUCTURES THEN WILL BE ERECTED ON SITES. THERE ARE 156 SPANS WHICH 3 LAUNCHING GIRDERS USED FOR ERECTING SEGMENTAL BOX GIRDERS AND 3 GANTRIES FOR INSTALLING THE PARAPETS. 15 SPANS WILL BE CONSTRUCTED USING THE CAST-IN-SITU METHOD. THE REST ARE INSTALLING THE CABLE TROUGH AND HAND RAILING.
No comments:
Post a Comment