Sunday, September 21, 2008
LAST 10 DAYS OF RAMZAN
Tuesday, September 16, 2008
MALAYSIA METRO-part 2
Photo 1 : The metro network in Kuala Lumpur.THERE ARE 5 COMPANIES OPERATES THEIR SUBWAY LINES SUCH AS RAPID KL, KTM KOMUTER, ERL AND KL MONORAIL. ALTHOUGH IT'S CALLED LRT (LIGHT RAIL) AS IT IS A FULLY INDEPENDENT METRO. TOTAL SUBWAY LINES ARE 9, LISTS OF THEM ARE :
1. SENTUL-PORT KLANG
- 23 STATION, 153 km, OPERATED BY KTM KOMUTER
- 22 STATIONS, 153 km, OPERATED BY KTM KOMUTER
3. KELANA JAYA LINE (Kelana Jaya-Terminal PUTRA, Gombak)
- 24 STATIONS, 29 km, OPERATED BY RAPID KL
4. AMPANG LINE
- 2 ROUTES (Sentul Timur-Sri Petaling and Sentul Timur-Ampang)
- 25 STATIONS, 27 km, OPERATED BY RAPID KL
5. PRT KL MONORAIL (KL Sentral-Titiwangsa)
- 11 STATIONS, 8.6km, OPERATED BY KL MONORAIL
- 5 STATIONS, 75 km, OPERATED BY ERL
- NONSTOP OVER 75 km (within 28 minutes, about 160 km/hr), OPERATED BY ERL
8. Aerotrain at KLIA (Main Terminal-Satellite A Building)
- 2 STATIONS, 2.5 km (assumed), OPERATED BY MALAYSIA AIRPORT HOLDING BHD

Photo 2 : Kuala Lumpur International Airport (KLIA).
Photo 3 : KLIA Transit station
Photo 5 : Kelana Jaya Line, formerly known as PUTRA LRT.

Photo 6 : KTM Komuter.
Photo 7 : Ampang Line, formerly known as STAR LRT.

Monday, September 15, 2008
MALAYSIA METRO-part 1
Photo 1 : KL Sentral station, modal intergrated public transport.- INTER-CITY TRAIN TO THE NORTH UP TO THAILAND, DOWN SOUTH TILL SINGAPORE AND TO THE EAST COAST.
- EXPRESS RAIL LINK (ERL) CONSISTS OF KLIA TRANSIT (A FEW STOPPAGES SUCH AS PUTRAJAYA AND CYBERJAYA) AND KLIA EXPRESS TO THE INTERNATIONAL AIRPORT (NON-STOP). KL SENTRAL IS ALSO THE KL CITY AIR TERMINAL (KL CAT) WHERE YOU CAN DO CHECK-IN FOR FLIGHT.
- KELANA JAYA LINE (FORMERLY KNOWN AS PUTRA LRT) AND COMMUTES TO AN INTERCHANGE FOR AMPANG LINE AND SRI PETALING LINE (FORMERLY KNOWN AS STAR LRT).
- KL MONORAIL.
- KTM KOMUTER.
- FEEDER BUSSES AND TAXIS.
Tuesday, September 9, 2008
CIS UPDATES
Thursday, September 4, 2008
PARAPET TOOK PLACE
SEGMENT STATUS
Monday, September 1, 2008
THE RAMZAN
Wednesday, August 13, 2008
GROUTING AND BEARING INSTALLATION
Photo 1 : Grouted tendon.THE RAMP
Photo 1 : View taken on 4th July 2008.
Photo 2 : View taken on end of May.
THE RAMP IS CONNECTING THE EXIT LINE TO THE DEPO, CONSISTS 5 UNITS OR PARTS, NAMED U1 TO U5. EACH UNIT HAS ITS OWN PCC, RAFT AND LIFT. NUMBER OF LIFTS DEPEND TO THE DESIGN. FOR EXAMPLE, U1 AND U2 HAVE 4 LIFT WHERE U1 IS CONNECTING THE RAMP TO THE EXISTED 6 EXIT LINE. SO FAR, ALL PCC AND RAFT OF ALL UNITS HAVE BEEN CONCRETED. FIRST LIFT OF ALL UNITS EXCEPT U1 ALSO HAVE BEEN CASTED. THE LATEST UPDATED, SECOND LIFT OF U4 AND U5 ARE ALSO CASTED. AS A ROUGH CALCULATION, 49.5% OF WORK DONE.
STANDING IN THE EYES
Photo 1 : The great look of the new building of MTD Group.


